Pierroton - France

The infrastructure is an experiment aimed at determining the carbon, water, energy and nutrient balances of short rotation forests dedicated to biomass and wood production. The infrastructure comprises two sites located in Cestas and Salles. The Salles site (60 ha plot of pine forest), is fully operational since 2000 with an eddy flux tower (CO2, H2O, heat, radiation), nitrogen wet and dry depositions, soil moisture, micrometeorological and ancillary measurements. It is connected to the main power and satellite data transmission. The Cestas site is in construction. It will be composed of (1) a set of 32 plots organized into complete randomized blocks where forest management alternatives are compared and (2) a set of four large plots (10-12 ha) designed for carbon, nitrogen and water fluxes monitoring to be launched in 2012.

Identifier
Source https://www.deims.org/0a32df1c-bc8c-4c3e-b436-52fbbe11f200
Metadata Access https://deims.org/pycsw/csw?service=CSW&version=2.0.2&request=GetRecordById&Id=0a32df1c-bc8c-4c3e-b436-52fbbe11f200&outputSchema=http://www.isotc211.org/2005/gmd
Provenance
Publisher DEIMS-SDR
Contributor DEIMS-SDR Site and Dataset registry deims.org
Publication Year 2020
Rights This dataset is licenced under the Creative Commons Attribution 4.0 International (CC BY 4.0). See https://creativecommons.org/licenses/by/4.0/ license license
OpenAccess true
Representation
Language English
Discipline Environmental Monitoring